The Baden West highway junction was built in 1969/70 and has not undergone any significant renovations since then. Extensive maintenance measures were carried out to repair the existing infrastructure (including various engineering structures). Two areas in the agricultural zone were converted into installation sites for the construction site facilities. Suitable measures had to be taken to protect the affected soils from damage in the best possible way and they had to be properly recultivated once the construction work was complete.